Kungsmässan parking deck
Volym 0 M3 CO2 BESPARING 0 Ton VIKT PER M2 0 Kg Kontakta oss Volym 0 M3 CO2 BESPARING 0 Ton VIKT PER M2 0
Volym 0 M3 CO2 BESPARING 0 Ton VIKT PER M2 0 Kg Kontakta oss Volym 0 M3 CO2 BESPARING 0 Ton VIKT PER M2 0
In this project, EP’s boards had been drawn as awning insulation under a piled slab. This posed a whole range of challenges, as there were
In Project Helicopter the challenge for the client was pressure resistance despite low weight, as the Helipad was to be located on the top floor
Isobetong® is tasked with insulating the area in Project BT-Chemical, where the ground is heated to evaporate the toxins and thus cleanse the soil of